二、判断题
1.When traders set the time for shipment in a contract, the exporter should consider whether he can get the goods ready before the shipment date and whether the ship is available if the goods are ready. ( )
答案:对
2. If the L/C stipulates that the expiry date is July 31st without a shipment date, then the latest shipment date is construed as July 21st. ( )
答案:错
3.Methods of transport is one of the terms of shipment. ( )
答案:对
4.The term “ first half” of a month refers to 1st to 16th . ( )
答案:错
5.Sometimes, the L/C only stipulates an expiry date without shipment date, which means these two dates are the same. ( )
答案:对
三、英汉互译
1)UCP500 2) liner freight tariff 3) expiry date 4) ports of call 5) partial shipments 6) liner transport 7) sailing schedule 8) shipping space 9) dispatch money 10) bunker surcharge
答案:1)《跟单信用证统一惯例》国际商会第500号出版物 2)班轮运价表 3)有效期 4)挂靠港 5)分批装运 6)班轮运输 7)船期表 8)舱位 9)速遣费 10)燃油附加费
9.汉译英
1)租船运输 2)交单3)违约 4)转船附加费 5)装运港 6)装运有效期 7)合同条款 8)最迟装运期 9)装运条款 10)信用证
答案:1) shipping by chartering 2) presentation of documents 3) break contract 4) transshipment additional 5) port of loading 6) shipment date 7) terms of contract 8) the latest date for shipment 9) terms of shipment 10) letter of credit。